网站首页 软件下载 游戏下载 翻译软件 电子书下载 电影下载 电视剧下载 教程攻略
书名 | 水电水利工程施工测量规范 |
分类 | 科学技术-工业科技-化学工业 |
作者 | 国家能源局 发布 |
出版社 | 中国电力出版社 |
下载 | |
简介 | 内容推荐 本书为统一水电水利工程施工测量的技术要求,做到技术优选、经济合理,遵循安全适用、质量可靠的原则,满足水电水利工程施工的需要,修订本标准。本标准适用于大、中型水电水利工程的施工测量工作。 本标准主要内容有总则、术语和符号、平面控制测量、高程控制测量、地形测量、测量放样准备、开挖填筑及混凝土工程测量、金属结构与机电设备安装测量、地下工程测量、疏浚及渠堤测量、附属工程测量、施工期变形监测和竣工测量。 目录 Foreword 1 General Provisions 2 Terms and Symbols 2.1 Terms 2.2 Symbols 3 Horizontal Control Survey 3.1 General requirements 3.2 Selection and embedment ofhorizontal control network points 3.3 Terrestrial triangular network survey 3.4 Global positioning system (GPS) survey 3.5 Traverse survey 3.6 Maintenance and management ofhorizontal control network 4 Vertical Control Survey 4.1 General requirements 4.2 Geometric leveling 4.3 EMD-Trigonometric leveling 4.4 GPS fitting vertical survey 4.5 Field data processing and adjustment calculation 5 Topographic Survey 5.1 General requirements 5.2 Mapping control survey 5.3 Data acquisition and technical requirements 5.4 Underwater topographic survey 5.5 Graphs sofiware for digital topographic map and edition 6 Preparation for Setting-out 6.1 General requirements 6.2 Collection of the surveying data 6.3 Review of drawings and preparation of setting-out data 6.4 Inspection and calibration of surveying instruments 7 Surveying for Excavation, Filling and Concrete Works 7.1 General requirements 7.2 Excavation survey 7.3 Survey offilling works 7.4 Survey ofconcrete works 7.5 Setting-out methods and inspection of the setting-out points 7.6 Measurement of work quantity 7.7 Documentation 8 Installation Survey for Hydraulic Steel Structure and Electro-mechanical Equipme 8.1 General requirements 8.2 Specific installation control network and setting-out of installation point 8.3 Installation survey of penstock 8.4 Installation survey of trash rack 8.5 Installation survey of gate 8.6 Installation survey of hydrogenerator unit 8.7 Precise survey forinstallation 8.8 Documentation 9 Underground Works Survey 9.1 General requirements 9.2 Control survey outside tunnel (or cavern) 9.3 Control survey inside tunnel 9.4 Construction setting-out 9.5 Section survey and construction quantity measurement 9.6 Documentation 10 Dredging Works,Canal and Dyke Survey 10.1 Dredging works survey 10.2 Canal and dyke survey 10.3 Documentation 11 Ancillary Works Survey 11.1 Generalrequirements 11.2 Road survey 11.3 Transmissionline survey 11.4 Cofferdam and berm construction survey 11.5 Aggregate processing system survey 11.6 Mixing system survey 11.7 Transporting systemsurveying 12 Deformation Monitoring During Construction Period 12.1 General requirements 12.2 Reference network for horizontal displacement monitoring 12.3 Reference network for vertical displacement monitoring 12.4 Basic monitoring methods and technical requirements 12.5 Documentation 13 Finish Survey 13.1 General requirements 13.2 Earth-rock works 13.3 Concrete works 13.4 Installation works for hydraulic steel structure and electro mechanical equipment 13.5 Documentation Explanation of Wording in This Specification Normative References |
随便看 |
|
霍普软件下载网电子书栏目提供海量电子书在线免费阅读及下载。