简介 |
![]()
内容推荐 This book aims to teach the Petroleum logging employees the standard operating procedure (SOP) in Petroleum Logging Engineering Technology. The book is divided into eleven chapters. The eleven chapters named, respectively, Openhole Wireline Logging SOP, Pipe conveyed logging SOP, Fishing Operation SOP, Vertical Seismic Profile SOP, Free Point Indicator SOP, Bridge Plug Setting SOP' Truck Preventive Maintenance 1 SOP' Truck Preventive Maintenance 2 SOP, Truck Preventive Maintenance 3 SOP, Wireline Converyed Perforating SOP and Tubing Conveyed Perforating SOE This book narrates the standard operating procedure (SOP) from the whole process of petroleum logging engineering in detail. It can be used as a guidance book in petroleum logging employees' work and would improve their operation standardization and security. This book also should attract the attention of the managers in petroleum Logging industry, both domestic and abroad. They could supervise their employees whether operate in a standard procedure and teach them what the correct procedure is. What's more, this book also could be used for the students, who prepare to engage in the industry work, as a self-study book in Petroleum University. 作者简介 夏学锋,博士、高级工程师,石油勘探测井技术专家,从事石油勘探行业近二十年,先后在哈萨克斯坦、阿塞拜疆、阿联酋、阿曼等国家工作,具有丰富的现场施工和管理工作经验,先后参与了“海洋石油工程装备大数据”国家工程实验室建设、国家自然科学基金项目、中国科技项目管理专业委员会建设,获得十余项石油石化行业科学技术进步奖及管理创新成果奖,参与编写了石油工业出版社出版的测井专业技术论文集、中国商务出版社出版的人力资源管理实务,被列为高等教育“十三五”规划教材,在国外电子测量技术、中国石油石化等期刊发表专业学术论文二十余篇。 目录 Chapter 1 Openhole Wireline Logging SOP 1.1 Preparation at Bace 1.2 Mobilization 1.3 Preparation at Wellsite 1.4 Logging Operations 1.5 Post]obWellsite Procedure 1.6 Demobilization Chapter 2 Pipe Conveyed Logging SOP 2.1 Preparation at Base 2.2 Mobilization 2.3 Preparation at Wellsite 2.4 Operations 2.5 Post lob Wellsite Procedure 2.6 Demobilization Chapter 3 Fishing Operation SOP 3.1 Preparation at Base 3.2 Mobilization 3.3 Preparation at Wellsite 3.4 Operations 3.5 Post]ob Wellsite Procedure 3.6 Demobilization Chapter 4 Vertical Seismic Profile SOP 4.1 Preparation at Base 4.2 Mobilization 4.3 Preparation atWellsite 4.4 Operations 4.5 Post Job Wellsite Procedure 4.6 Demobilization Chapter 5 Free Point Indicator SOP 5.1 Preparation at Base 5.2 Mobilization 5.3 Preparation atWellsite 5.4 Operations 5.5 Post Job Wellsite Procedure 5.6 Demobilization Chapter 6 Bridge Plug Setting SOP 6.1 Preparation at Base 6.2 Mobilization 6.3 Preparation atWellsite 6.4 Operations 6.5 Post Job Wellsite Procedure 6.6 Demobilization Chapter 7 Truck Preventive Maintenance 1 SOP 7.1 Preliminary Inspection 7.2 Inspection Front of Cab 7.3 Inspection Left Side of Cab 7.4 Inspection Lower Left Side of Recorder Cab 7.5 Inspection Left Side Tandem Wheels Area 7.6 Inspection Right Side Tandem Wheels Area 7.7 Inspection Right Side of Cab 7.8 Inspection Under the Vehicle 7.9 Inspection Under the Cab Cover 7.10 Inspection Insidethe Cab 7.11 Inspection Lighting 7.12 Trouble Shooting Chapter 8 Truck Preventive Maintenance 2 SOP 8.1 Driving Inspection 8.2 Stationary Inspection 8.3 Engine Compartment Inspection 8.4 Tire And Wheel Inspection 8.5 Battery Inspection 8.6 Under Vehicle Inspection 8.7 Body Inspection 8.8 Air Conditioner Inspection 8.9 Safety Equipment Inspection 8.10 Air Cleaner Inspection 8.11 Fuel System Inspection 8.12 Auxiliary Generator Inspection 8.13 Hydraulic Inspection 8.14 Generator Inspection Chapter 9 Truck Preventive Maintenance 3 SOP 9.1 Driving Inspection 9.2 Stationary Inspection 9.3 Engine Compartment Inspection 9.4 Tire And Wheel Inspection 9.5 Battery Inspection 9.6 Under Vehicle Inspection 9.7 Body Inspection 9.8 Air Conditioner Inspection 9.9 Safety Equipment Inspection 9.10 Air Cleaner Inspection 9.11 Raise Front End Inspection 9.12 Lubrication Inspection 9.13 Fuel System Inspection 9.14 Auxiliary Generator Inspection 9.15 Hydraulic Inspection 9.16 AT-355/aubum Transmission Inspection 9.17 Draw Works 9.18 Generator Inspection Chapter 10 Wireline Conveyed Perforating SOP 10.1 Preparation at Base 10.2 Mobilization 10.3 Preparation at Wellsite 10.4 Operations 10.5 Post Job Wellsite Procedure 10.6 Demobilization Chapter 11 Tubing Conveyed Perforating SOP 11.1 Preparation at Base 11.2 Mobilization 11.3 Preparation at Wellsite 11.4 Operations 11.5 Post Job Wellsite Procedure 11.6 Demobilization Appendix 1 Depth Control Policy Appendix 2 CNLC Fishing Policy Appendix 3 Prevention of Sticking Appendix 4 Quick Splice Instructions Appendix 5 Square Knot (Reef Knot) Appendix 6 Reverse Cut and Thread Appendix 7 Crane Operation Appendix 8 Wellhead Voltage Levels Appendix 9 Radio Silence Appendix 10 Power Shutdown Appendix 11 TCP String Appendix 12 Torque for Threaded Connections |