中国葛洲坝集团公司编著的《三峡700MW水轮发电机组安装技术(英文版)(精)》从上万张的施工图片和几百小时的影像资料中选取了454张图片展示了机电安装外在的美丽,以图文并茂的形式介绍了阿尔斯通700MW水轮发电机组的安装过程。这些内容通过三大部分涵盖了长江三峡工程的整体介绍,水轮机各部件的安装及整体组装技术,发电机各部件的安装及整体组装技术。本书适合从事水轮发电机组安装的技术人员在实际工作中参考使用,也可供大专院校相关专业的师生学习参考。
网站首页 软件下载 游戏下载 翻译软件 电子书下载 电影下载 电视剧下载 教程攻略
书名 | 三峡700MW水轮发电机组安装技术(英文版)(精) |
分类 | 科学技术-建筑-水利水电 |
作者 | 中国葛洲坝集团公司 |
出版社 | 中国电力出版社 |
下载 | ![]() |
简介 | 编辑推荐 中国葛洲坝集团公司编著的《三峡700MW水轮发电机组安装技术(英文版)(精)》从上万张的施工图片和几百小时的影像资料中选取了454张图片展示了机电安装外在的美丽,以图文并茂的形式介绍了阿尔斯通700MW水轮发电机组的安装过程。这些内容通过三大部分涵盖了长江三峡工程的整体介绍,水轮机各部件的安装及整体组装技术,发电机各部件的安装及整体组装技术。本书适合从事水轮发电机组安装的技术人员在实际工作中参考使用,也可供大专院校相关专业的师生学习参考。 内容推荐 The Yangtze River Three Gorges Project is a remarkably big project. After genera- tions of research, survey, planning, designing and construction by Chinese people, the 700MW hydro-generator units have been installed in Three Gorges Project, Which is a significant breakthrough. 454 pictures were selected from tens of thousands of construction pictures and a few hundreds of videos showing the beauty of mechanical and electrical installation project for the book. The installation process ofALSTOM 700MW hydro-generator unit with words and pictures. It includes brief introduction on three gorges project, turbine installation, generator installation. This is a practical and readable book for students and teachers in college and workers in this industry. 目录 Preface Editor's Note Part One Overview 1 Brief Introduction on Three Gorges Project 2 Major Technical Parameters for Turbine Generator 3 Structure of Turbine and Generator 4 Installation Procedure for Turbine and Generator 5 Safety Precautions Part Two Turbine Installation 1 Pit Survey 2 Installation of Bottom Ring 3 Trial Installation of Distributor 4 Runner Installation & Stay Ring Machining 5 Distributor Installation 6 Turbine Shaft Installation 7 Air Admission System Installation 8 Turbine Guide Bearing and Seals Installation 9 Installation of Mechanical Parts for Governor Part Three Generator Installation 1 Stator Frame and Core Assembly 2 Stator Winding Assembly 3 Rotor Assembly 4 Lower Bracket and Thrust Bearing Assembly 5 Stator Installation 6 Lower Shaft and Lower Bracket Installation 7 Rotor Installation 8 Upper Bracket Assembly and Installation 9 Generator Final Installation and Unit Axis Alignment |
随便看 |
|
霍普软件下载网电子书栏目提供海量电子书在线免费阅读及下载。