![]()
内容推荐 本译本是根据中国水利水电出版社出版的《水电工程钻孔注水试验规程》NB/T 35104-2017翻译的,著作权归国家能源局所有。在使用过程中,如出现异议,以中文版为准。 本规程适用于水电工程钻孔注水试验。 目录 1 General Provisions 2 Terms and Symbols 2.1 Terms 2.2 Symbols 3 Basic Requirements 4 Test Preparation 4.1 Drilling Hole 4.2 Equipment Selection 4.3 Equipment Installation 4.4 Hole-Flushing and Groundwater Level Measurement 5 Standard Water Injection Test with Constant Head 6 Standard Water Injection Test with Falling Head 7 Simple Water Injection Test 8 Data Arrangement and Calculation 8.1 Standard Water Injection Test with Constant Head 8.2 Standard Water Injection Test with Falling Head 8.3 Simple Water Injection Test Appendix A Permeability Classification of Rock and Soil Appendix B Installation Structure Diagram Appendix C Record Sheet for Equipment Installation Appendix D Observation Record for Groundwater Level Before Test Appendix E Observation Record for Test Appendix F Permeability Coefficient Calculation Diagram and Table for Water Injection Test of Borehole Constant Head Appendix G Water Head Calculation for Water Injection Test Appendix H Shape Coefficient Selection Appendix J Permeability Coefficient Calculation Diagram and Table for Water Injection Test of Borehole Falling Head Explanation of Wording in This Specification List of Quoted Standards |