![]()
内容推荐 本教材按照国际行业标准《ATA100规范》章节结构划分,共设计五个项目,采用活页编写格式。项目一为飞机整体案例学习,对接5-12章;项目二为飞机系统案例学习,对接20-49章;项目三为飞机结构案例学习,对接51-57章;项目四为螺旋桨/旋翼案例学习,对接60-67章;项目五为飞机动力装置案例学习,对接70-80章。项目一、二、三、五针对固定翼飞机,基于B737-600/700/800/900机型;项目四针对旋翼飞机,基于罗宾逊R66机型。所有项目尽可能采用机械及电子维护实操任务。附录Ⅰ和附录Ⅱ分别增加了8套固定翼飞机“实操程序”及10套旋翼飞机“实操程序”作为补充。 本教材紧密联系民航维修实际英语需求,岗位针对性强,主要适用于高职院校飞机维修、发动机维修、飞机电子设备维修、通用航空维修等相关专业作为专业英语教材,或“飞机维修文件手册查询与学习”课程的英语学习教材,可供各大航空公司、飞机维修公司在职机务维修人员用作岗位专业英语能力提升自学教材或新员工培训教材。另外,本教材可用于CCAR-147培训机构作为航空维修技术英语等级测试培训教材,还可供飞机维修爱好者参考。 目录 前言 Item 1 Case Study in Aircraft General (Chapter 5-12)(For the Fixed-wing Aircraft) ★Learning Objectives ★Item Guide ★Item Preparation ★Aviation Listening & Speaking Task 1 Tow the Airplanes With Flat Tires(TASK 09-11-04-580-801 P/B 200) Task 2 Rudder Bonding Strap HIRF/Lightning Inspection (TASK 05-55-08-200-801 P/B 600) ★Warning Case Study ★Career Simulation Test Item 2 Case Study in Aircraft Systems (Chapter 20-49)(For the Fixed-wing Aircraft) ★Learning Objectives ★Item Guide ★Item Preparation ★Aviation Listening & Speaking Task 3 Flap/Slat Electronics Unit (FSEU) Installation (TASK 27-51-01-400-801 P/B 400) Task 4 Pitot Probe Cleaning (TASK 34-11-01-100-801 P/B 700) ★Warning Case Study ★Career Simulation Test Item 3 Case Study in Aircraft Structures (Chapter 51-57)(For the Fixed-wing Aircraft) ★Learning Objectives ★Item Guide ★Item Preparation ★Aviation Listening & Speaking Task 5 Fixed Trailing Edge Upper Panel - Adjustment/Test (TASK 57-50-01-820-801 P/B 500) Task 6 Lightning Diverter Strip Temporary Repair (TASK 53-52-03-300-801 P/B 800) ★Warning Case Study ★Career Simulation Test Item 4 Case Study in Propeller/Rotor (Chapter 60-67)(For Rotorcraft Only) ★Learning Objectives ★Item Guide ★Item Preparation ★Aviation Listening & Speaking Task 7 Removal of Rotor Blades (TASK 62-10) Task 8 Installation of Main Rotor Gearbox Assembly (TASK 63-20) ★ Warning Case Study ★ Career Simulation Test Item 5 Case Study in the Powerplant (Chapter 70-80)(For the Fixed-wing Aircraft) ★Learning Objectives ★Item Guide ★Item Preparation ★Aviation Listening & Speaking Task 9 Start the Engine Procedure (Engine Cross Bleed Start) (TASK 71-00-00-800-810-F00 P/B 200) / 142 Task 10 MMEL 74-1 (DDPG) Preparation - Right Ignition System Inoperative(TASK 74-00-00-040-801-F00 P/B 900) ★Warning Case Study ★Career Simulation Test APPENDIX I Supplementary PP Tasks (For Fixed-wing Air-craft) Item 1 Case Study in Aircraft General (Chapter 5-12) Task 1 Flush the APU Oil (TASK 12-13-31-610-802) Task 2 Wire Bundle Inspection - Right Wheel Well (TASK 05-55-26-200-802) Item 2 Case Study in Aircraft System (Chapter 20-49) Task 3 Control Stand Floodlight - Lamp Replacement (TASK 33-14-00-960-802) Task 4 Electrical Connector and Terminal Inspection (TASK 49-11-01-200-802) Item 3 Case Study in Aircraft Structures (Chapter 51-57) Task 5 Open the Galley Service Door With the Interior Handle (TASK 52-41-00-860-803) Task 6 Nose Radome Removal (TASK 53-52-00-000-801) Item 5 Case Study in the Powerplant (Chapter 70-80) Task 9 Chip Detector Access/Pressure Relief Door Free Play Adjustment(TASK 71-11-07-820-802-F00) Task 10 Engine Start Brake Switch Installation (TASK 76-11-11-420-801-F00) APPENDIX II PP Tasks (For Rotorcraft) Item 1 Case Study in Aircraft General (Chapter 5-12) Task 1 Parking in High Wind or Turbulent Air (TASK 10-11) Task 2 Chip Detector and Sight Gage (TASK 12-13) Item 2 Case Study in Aircraft System (Chapter 20-49) Task 3 Fuel Quality Sender (TASK 28-21) Task 4 Navigation Light (TASK 33-21) Item 3 Case Study in Aircraft Structures (Chapter 51-57) Task 5 Empennage Assembly (TASK 53-50) Task 6 Vertical Stabilizer (TASK 53-51) Item 4 Case Study in Propeller/Rotor (Chapter 60-67) Task 7 Input Shaft Seal Replacement (TASK 65-42) Task 8 Tail Rotor Controls (TASK 67-50) Item 5 Case Study in the Powerplant (Chapter 70-80) Task 9 FCU Fuel Cutoff Control Rigging (TASK 76-12) Task 10 Fuel Quantity Gage (TASK 95-35) APPENDIX III Comparison of ATA 100 Chapters in English & Chinese REFERENCE |